JXCirrus Maths for Mac 2.0.00 freeware
A solution for basic maths training for primary school children. JXCirrus Maths lets you set up custom exercises based on times tables, addition, subtraction and division. Set how often the exercises need to be run, then use it to race against the fastest time. Can be set up to cycle through a family photo album when each exercise is completed. ...
Author | JXCirrus |
Released | 2022-11-02 |
Filesize | 16.11 MB |
Downloads | 791 |
OS | Mac OS X, |
Installation | Install and Uninstall |
Keywords | Maths, math, multiplication, subtraction, addition, division, times tables, sums |
Users' rating (29 rating) |
JXCirrus Maths for Mac Free Download - we do not host any JXCirrus Maths for Mac torrent files or links of JXCirrus Maths for Mac on rapidshare.com, depositfiles.com, megaupload.com etc. All JXCirrus Maths for Mac download links are direct JXCirrus Maths for Mac download from publisher site or their selected mirrors.
2.0.00 | Nov 2, 2022 | New Release | Bug Fixes:
- Fixed an issue with pop-up dialogs. - Improved the reliability of cloud sync. |
1.11.0 | Sep 10, 2020 | New Release | Bug Fixes: - Fix to the app data store. |
1.10.0 | May 11, 2020 | New Release | Bug Fixes: - Fixed an error with file locking. - Fixed a UI layout bug. |